Saudi Arabia King Abdullah Economic City - Port of Red Sea
Technical specifications - planned from 2017
- Installed capacity: 2.7m moves (3.7m TEUs)
- Draught: 16.5m
- Quay length: 2,100m
- Area: 105ha
- Maximum vessel size: 16,000 TEU
- No. of Quay Cranes (STS): 18
- No. of Quay Cranes (MHC): 3
Planned Key features
- Located in the vicinity of King Abdullah Economic City, which is expected to become the main economic centre of the region
- Several phases of capacity increase planned
- The port is designed to handle the new generation mega-vessels
- State-of-the-art terminal with the latest technology available